65 427 S/C ROADSTER PROJECT

Well, when the friends pages were added, somehow all the Page 1 build progress was lost.

So, recapturing all that is a challenge.  The body and all the parts arrive 10/18/02:

Owner seems happy:

Looks like a project. Time to assemble the parts.  Oatfield Ward Teachers Quorum called into action.  Let's get the front suspension on today:

14 year olds cab assemble these FFR's!  Now, what did the manual say?

Now, that was not hard.  Left side installed.

Steering rack in place.  Brakes installed.

It's a real 1965 roadster.

 

 

top of page

Website Designed and Maintained by LNJ