|
|
65 427 S/C ROADSTER PROJECT |
|
|
|
| Page 3 Progress | |
|
Installing Aluminum Panels on 26 & 27-Dec-2002 Installed brakes Jan 1-11, 2003 Installed March accessory pulleys 1/15/03 Installed gas tank 1/24-03: Installed engine 1-25-03 Sidepipes installed 1-27-03 Finished Nylon Fuel Lines Feb 2, 2003 Got out wiring from donor Feb 7, 2003. Really large mass of stuff. Completely covered a 4x8 sheet of plywood. Will have to pause and re-think the wiring plan. Regrouping to use 93-type system; contracted with a third party to supply a complete wiring system for the whole car. Sent off on Feb 15, 03 my extra 93 Cobra EEC-IV and an under-dash harness from a 92 GT so he can provide a system including a "wire diet" stripping away all un-needed wires and connectors. Feb 18, completed radiator, shroud, and fan install. Feb. 22, 03 Dick & Judy Calhoun visited from Jacksonville, Oregon. Completed rear panels called "fins", for lack of better word. Need to install Emergency Brake cables before covering up with sheet metal. Feb. 26, 2003 Completed E-brake cables, March 7-8 completed trunk panels Trial fit rear cockpit alum panels Match 18, 2003 in Provo, Utah with Todd Hinckley's help, drilled holes in dash board for gauges, exact CSX format:
Using Autometer "Cobra" gauges, 0-180 reversed speedometer, temp in degrees C, etc. Finished sheet metal: Re-Installed pedal box with pedals 4/1/03: Received new seats from SOFAST Technology 4/2/03:
Notice fills width of area for seat, slightly higher back.
Body on...just the right height. 4-24-03 |
|
| top of page | |
|
Website Designed and Maintained by LNJ |
|