|
|
65 427 S/C ROADSTER PROJECT |
|
|
|
| Page 5 Progress | |
|
May 2, 2003 Meatballs arrived today; look familiar Griff? Almost a race car! Seats fit the car perfectly! 5/5/3 Dashboard finished (front at least) Click to enlarge these small pictures for more detail. May 10, 2003 Optima battery installed: Note plus post for thru-trunk connection ahead of battery. Also, negative on sidewall. For finished battery with connections, see Las Vegas Billet Optima base available at Attebury Street Rods at phone 530-272-7154 email at atteburystrods1@aol.com Radiator hose shrink fit connectors...no more clamps:
EEC-IV & coil mounted under dash:
Coil computer connection on Firewall, engine-side
State of Oregon plate received today 5/10/03: Almost ready! 5/12 & 13 Worked on the following: Completed battery cables, connected dash to car wires, added fluids, oil primed the engine, blocked off the EGR valve hole, installed 93 O2 sensors, routed temperature gauge capillary, installed trunk prop, replaced trunk aluminum panel small tabs, added gas tank filler neck, installed the remote oil filter, and coupled upper radiator hose using shrink tube fittings. Tested the wiring harness: fuel pump always on...Ed Railey is helping fix the 3rd party's mistake. 5/14: ENGINE STARTED!!! (runs fine)
Nice work, Mr. Railey! May 27, added T-Filler
|
|
| top of page | |
|
Website Designed and Maintained by LNJ |
|