[ Up ] [ Steam Turbines ] [ Reciprocating Engines ] [ Gas Turbines ] [ General Differences ] [ Energy FAQ's ]
| |
item
1 |
item
2 |
item
3 |
item
4 |
item
5 |
item
6 |
|
Base
Load Capacity |
mW |
4 |
10 |
11 |
19 |
30 |
35 |
|
Engine |
Make |
Allison |
GE
MS5001J |
Rolls
Royce |
GE
Frame 5 |
ABB |
GE
Frame 6 |
|
Number
Available |
Quantity |
1 |
2 |
3 |
2 |
1 |
8 |
|
Peak
Capacity |
MW |
4.2 |
11 |
12 |
21 |
32.8 |
38 |
|
Fuel |
Type |
gas/diesel |
gas |
gas/diesel |
gas/diesel |
gas/diesel |
gas/diesel |
|
Heat
Rate |
Btu/kWh |
13000 |
13000 |
13000 |
12500 |
12500 |
12750 |
|
Electrical
switchgear,
transformers, etc |
available
as needed |
|
Time
from order to arrival of
genset |
weeks |
3 |
8 |
8 |
16 |
6-8 |
12 |
|
Time
for arrival of emission
controls |
weeks |
24 |
24 |
24 |
24 |
24 |
24 |
|
Prior
Usage |
years |
4 |
15 |
2 |
5 |
12 |
0.5 |
|
Life
Expectancy |
years |
28.5 |
28.5 |
28.5 |
28.5 |
28.5 |
28.5 |